Home/Capabilities/Quality Control and Inspection
Inspection from the specification to release
The inspection and test plan defines what is checked, when it is checked and which records demonstrate acceptance. SBCCO-China coordinates local manufacturing follow-up and the agreed inspection scope. Your nominated inspector or an agreed independent inspection organization can be included at the relevant hold and witness points.
01
Inspection stages and evidence
| Before manufacture | Confirm drawing revision, materials, design responsibility, acceptance criteria and required documents. |
|---|---|
| Material receipt | Check material identification and the agreed certificates against the order and item marks. |
| During fabrication | Review dimensions, welding or laminate requirements and the examinations defined for that construction. |
| Tests and witness points | Agree test method, coverage, acceptance limits, witness attendance and identifiable results. |
| Deviation and repair | Record the issue and proposed disposition; obtain the required agreement before accepting a change. |
| Release and data book | Check the agreed records, as-built information, preservation, packing and item identification before shipment. |
02
An inspection plan matched to the item
A vessel, a cast gear and a batch of liners do not require the same test plan. Define the method, extent, acceptance level and records for each item. A test-method name alone is insufficient. Sampling or full coverage is agreed against the contract and the product, not selected after inspection has started.
Independent inspection does not remove the manufacturer’s or designer’s responsibility. Where a code stamp or a specific qualification is required, its scope and validity are checked for the selected facility and item. A historical certificate is not treated as proof of current authorization.
03
A documented inspection example
Two inspected stainless steel tube bundles for Minara
The Glencore project reference identifies two stainless steel tube bundles for Minara’s hot-acid heat exchanger in 2019. The third-party inspection report dated 9 January 2019 covers two tube bundles, with material-record review, dimensional checks, tube-to-tubesheet inspection and witnessed hydrostatic testing among the stated activities. The example concerns replacement bundles and their inspection scope, not the thermal design of an entire acid plant.
04
Inspection as a standalone service
You can define an inspection or expediting assignment for equipment you purchase directly. Send the order scope, shop location, drawing list, inspection plan, manufacturing stage and required reports. Agree site access and the authority to stop or release work before the visit.
05
Practical inspection questions
Do all items require full inspection?
The plan defines the coverage. A unique large assembly and a batch of repeat parts need different checks. Agree the sampling or full-coverage requirements and acceptance criteria before manufacture.
Can the customer appoint an inspector?
Yes. Agree access, the inspection scope and the relevant manufacturing stage. Identify hold points early enough for attendance to be arranged before the work is covered or the equipment is packed.
Does a certificate replace the product checks?
No. A management-system certificate, a material certificate and a product test report demonstrate different things. Specify which evidence is required and check that its scope and validity match the order.
How are proposed deviations handled?
Record the requirement, the proposed alternative and its technical consequences. The responsible party agrees the disposition before the change is accepted; it is not treated as compliant simply because it has already been made.
What should be in the final equipment record?
The agreed material, dimensional, fabrication and test records, any required third-party reports and the applicable as-built information. Link the documents to item marks and resolve missing records before release.
Can you inspect an order placed directly by us?
Yes, as a defined service assignment. Provide the order, drawings, manufacturing status, access arrangements and required reports. Agree what decisions the inspector may make and what must be referred back to you.
08
Discuss your equipment
Send your drawing, operating conditions and required site date. SBCCO-China will review the supply scope, materials, inspection and delivery requirements.