Home/Products/Solid and liquid separation equipment
Solid and liquid separation equipment
SBCCO-China supplies thickeners, clarifier components, FRP launders and feedwells, filter presses, ceramic filters and hydrocyclone packages from China. New equipment and replacement internals are quoted against the slurry, separation target and installation geometry. The supply scope can combine fabricated items with piping, supports and the agreed inspection documents.
01
Supply scope
A separation enquiry starts with feed characteristics and a measurable process target. Equipment area or vessel diameter alone does not determine capacity, cake moisture or overflow quality. A replacement launder is primarily an interface and fabrication problem; a new thickening or filtration duty also needs a process-design basis and, where appropriate, testwork. These scopes should be separated in the quotation.
Thickener and clarifier internals
Feedwells, launders, weirs, collection systems and covers for new equipment or existing basins, coordinated with supports and access.
Filter presses and plates
Chamber and membrane press options with the plate arrangement, cloth, wash sequence and discharge requirements selected against the slurry.
Ceramic and belt filtration
Filter equipment for concentrate, tailings and industrial slurry duties; process targets and test conditions form part of the selection.
Hydrocyclones and associated packages
Single units and clusters, distributors, liners and piping specified around the classification duty and the plant interfaces.
02
Documented specifications and selection basis
These are documented product ranges and project examples. They help define an enquiry; the selected equipment is confirmed against its own duty, drawings and acceptance requirements. A historical shipment is not a statement of a shop’s current maximum capacity.
| Item | Specification and scope |
|---|---|
| Documented large-basin reference | Two FRP launder systems for 73.2 m diameter thickeners; the diameter belongs to the host thickeners. |
| Fabrication materials | Steel or FRP tanks and internals, with material selected for the liquid chemistry and mechanical loading. |
| Press construction | Chamber and membrane filter presses and replacement plates are represented in the filtration literature. |
| Process inputs | Solids loading, particle-size distribution, slurry temperature, filtration behaviour and target cake or overflow quality. |
| Performance acceptance | Throughput, moisture, clarity and test conditions are defined for the duty; catalogue claims are not universal guarantees. |
03
Service conditions and applicable standards
For a retrofit, survey the basin and the steel or concrete supports before finalizing the internals. For a press, describe the complete filtration cycle rather than only the feed rate. For a cyclone package, identify the desired separation, feed pressure and expected variation. Clear liquid and dry cake can be competing objectives, so the acceptance test should say how the feed is characterized and how each result is measured.
The fabrication standard follows the actual construction: FRP tank items may reference ASTM D3299, ASTM D4097 or ASME RTP-1 where applicable, while steelwork, drives and purchased components follow their own specifications. No single vessel code certifies the separation process. State the mechanical standard, process guarantee responsibility and acceptance test separately.
04
Inspection and release documents
The inspection plan turns the purchase specification into manufacturing checkpoints. Before production, identify the drawing revision, material requirements, acceptance limits and required records. Separate mandatory hold points from progress observations so that an inspection visit happens while the work can still be checked. If the order includes a third-party witness, the attendance and release arrangements belong in the schedule.
For this product line, the review focuses on basin and support interfaces, fabricated dimensions, material identification, moving clearances, specified mechanical checks and the agreed process-test conditions. The final document list is agreed with the order: material records, dimensional reports, applicable fabrication and test records, release information and packing identification. Changes or deviations are resolved against the approved specification before acceptance, with the responsible engineer involved where required.
05
Project references with measured scope
FRP launders for 73.2 m thickeners
The WesTech supply reference records two FRP launder systems in 73.2 m diameter thickeners in Puerto Rico. The diameter describes the host thickeners, not the diameter of a shop-built FRP tank. The supply scope was the launder systems; the record does not establish a complete thickener design or a process-throughput guarantee.
Reference supplied by our sister company, Crimar Industrial.
06
What to send for a quotation
Send slurry composition, solids concentration, particle sizes, temperature, feed rate and variability, target cake moisture or overflow quality, testwork, basin survey and available footprint. Include quantities, the required date at site, the destination port or plant and the preferred delivery terms. If you are replacing existing equipment, add photographs showing connections, access and the failure or wear pattern. Mark dimensions that have been measured on site and identify any values still awaiting confirmation.
For a comparable quotation, define the battery limits: equipment, bought-out components, supports, drawings, inspection, packing and transport. Ask for technical exceptions and exclusions alongside the price. This makes it possible to compare proposals on the same scope and prevents an omitted inspection, connection or document from becoming a site problem. A preliminary budget can proceed with stated assumptions; manufacture follows the approved final requirements.
07
Buyer questions
Can you replace the internals without supplying a new basin?
Yes, against a verified survey and an agreed support arrangement. The Puerto Rico reference concerns launder systems inside existing large thickeners. Confirm the basin geometry, loading, levels, maintenance access and connection details; a large basin diameter does not mean the entire vessel was supplied in FRP.
What information do you need to quote?
Send slurry composition, solids concentration, particle sizes, temperature, feed rate and variability, target cake moisture or overflow quality, testwork, basin survey and available footprint. Include the required delivery date, destination and inspection requirements. Identify which information is preliminary and which drawing is approved. We can then return a scoped proposal with technical assumptions, exclusions, documentation and the proposed delivery basis, rather than a price based only on a product name.
How is the inspection scope agreed?
Use an item-specific inspection and test plan. For this equipment it should address basin and support interfaces, fabricated dimensions, material identification, moving clearances, specified mechanical checks and the agreed process-test conditions. Identify hold and witness points before production and link the final records to the equipment marks. Where independent inspection is required, agree the inspector and attendance scope before the relevant manufacturing stage.
Can you use the material or standard named in our specification?
Yes, subject to review of the actual item and manufacturing route. Name the standard and edition, material grade, required condition and acceptance criteria in the enquiry. If an alternative is proposed, the difference is stated for agreement before manufacture. Material equivalence, equipment design and manufacturer certification are separate questions and should be resolved separately.
What is the lead time and is the equipment in stock?
Delivery is quoted for the particular order. The schedule depends on drawing approval, material availability, manufacturing, inspection, packing and transport. Give the required site date and identify shutdown constraints so the proposal can separate the production and shipping stages. The examples on this page describe supply capability and past work; they are not an offer of stock or a fixed catalogue lead time.
Can you coordinate packing and shipment to our site?
Yes, with the shipping scope and destination agreed in the order. Confirm package dimensions and weights, lifting arrangements, preservation, unloading access and any assembly needed after delivery. Large equipment may travel in sections or require a special shipping arrangement. Packing dimensions and gross weights are identified separately from the dimensions and net weight of the equipment.
Can I use a past project as the specification for a new order?
Use the reference to identify comparable equipment, then specify the new duty. A recorded quantity, capacity or shipping weight applies to that project and is not a universal operating limit. Where a reference comes from our sister company, the attribution appears beside the case. Send your current operating conditions and interfaces so the new proposal can establish the correct construction and acceptance basis.
08
Discuss your equipment
Send your drawing, operating conditions and required site date. SBCCO-China will review the supply scope, materials, inspection and delivery requirements.