SBCCO-China supplies industrial valves, corrosion-resistant lined valves, FRP dampers and actuated packages from China. Valve type, body and wetted materials, connection geometry, pressure-temperature duty and actuator requirements are established for each service. The supply scope includes manual and controlled isolation for slurry, acid, water and gas applications.

01

Supply scope

A valve must be specified as an assembly. The lining, seat, stem seal and actuator can limit the service even when the metal body has an adequate pressure class. For replacement work, face-to-face dimensions, flange drilling and operating clearances matter as much as bore. Corrosive gas dampers also require the actual pressure difference, leakage requirement, temperature and movement cycle.

Gate, globe and check valves

Isolation, throttling and non-return duties, with the valve function and installation direction defined before selecting the construction.

Ball and butterfly valves

Manual or actuated arrangements, including lined constructions for corrosive fluids and project-specific seats and seals.

Control and actuator packages

Valve, actuator, mounting interface and control accessories coordinated with the plant power, signal and fail-action requirements.

FRP and lined dampers

Corrosive-gas isolation and control dampers, with blade geometry, shaft details, sealing and support interfaces specified against the duct system.

02

Documented specifications and selection basis

These are documented product ranges and project examples. They help define an enquiry; the selected equipment is confirmed against its own duty, drawings and acceptance requirements. A historical shipment is not a statement of a shop’s current maximum capacity.

ItemSpecification and scope
Documented ordered sizesPASAR’s 2019 lined-valve order includes nominal sizes of 50, 80, 100, 150, 200 and 250 mm.
Documented ordered constructionsPFA-lined gate and globe valves; PTFE-lined butterfly valves. The historical order contains 20 valves in total.
Actuator interfaceISO 5211 mounting is listed in the valve literature; confirm the actual mounting, torque and drive details.
Connection geometryASME B16.10 face-to-face and ASME B16.5 flange arrangements are referenced in the supply literature; select the required arrangement per item.
Acceptance requirementsShell, seat, lining continuity and actuator checks are specified as applicable; fire-safe or emissions certification requires separate evidence.

03

Service conditions and applicable standards

Start with function: shutoff, throttling, non-return or protection. Provide normal and maximum differential pressure, fluid properties and the required leakage basis. Identify manual access, actuator orientation and emergency action. Do not apply a lining catalogue’s maximum temperature to every body, seat and actuator combination. For a damper, include duct loads and supports so that the actuator is not asked to compensate for a distorted frame.

The order must distinguish valve construction, connection dimensions and test requirements. The supply literature references ISO 5211, ASME B16.10 and ASME B16.5 for those interfaces. The required design or test standard, edition, pressure class and acceptance criteria are confirmed for the selected valve. A brochure claim is not evidence of fire-safe approval, fugitive-emissions certification or a particular leak rate.

04

Inspection and release documents

The inspection plan turns the purchase specification into manufacturing checkpoints. Before production, identify the drawing revision, material requirements, acceptance limits and required records. Separate mandatory hold points from progress observations so that an inspection visit happens while the work can still be checked. If the order includes a third-party witness, the attendance and release arrangements belong in the schedule.

For this product line, the review focuses on body and trim identity, lining and seat condition, flange and face-to-face dimensions, specified shell and seat tests, travel direction and actuator function. The final document list is agreed with the order: material records, dimensional reports, applicable fabrication and test records, release information and packing identification. Changes or deviations are resolved against the approved specification before acceptance, with the responsible engineer involved where required.

05

Project references with measured scope

PASAR order for 20 lined valves

PASAR’s August 2019 purchase order to SBC specifies 20 lined valves across ten order lines: 16 PFA-lined gate valves, two PFA-lined globe valves and two PTFE-lined butterfly valves. Nominal sizes in that order run from 50 to 250 mm. This is the recorded order scope, supported by the PASAR supply reference; it is not a pressure-temperature rating or a new delivery promise.

View this project reference

06

What to send for a quotation

Send valve function, line size, medium and concentration, pressure and temperature, differential pressure, flange standard, face-to-face dimension, seat leakage requirement, actuator power and fail position. Include quantities, the required date at site, the destination port or plant and the preferred delivery terms. If you are replacing existing equipment, add photographs showing connections, access and the failure or wear pattern. Mark dimensions that have been measured on site and identify any values still awaiting confirmation.

For a comparable quotation, define the battery limits: equipment, bought-out components, supports, drawings, inspection, packing and transport. Ask for technical exceptions and exclusions alongside the price. This makes it possible to compare proposals on the same scope and prevents an omitted inspection, connection or document from becoming a site problem. A preliminary budget can proceed with stated assumptions; manufacture follows the approved final requirements.

Send your drawing and service conditions

07

Buyer questions

Can you replace an existing valve without changing the pipework?

Yes, if the replacement is checked against the installed dimensions and service. Bore and pressure class alone are insufficient. Provide the flange drilling, face-to-face dimension, access restrictions, fluid conditions and actuator details, then agree the substitution drawing before manufacture.

What information do you need to quote?

Send valve function, line size, medium and concentration, pressure and temperature, differential pressure, flange standard, face-to-face dimension, seat leakage requirement, actuator power and fail position. Include the required delivery date, destination and inspection requirements. Identify which information is preliminary and which drawing is approved. We can then return a scoped proposal with technical assumptions, exclusions, documentation and the proposed delivery basis, rather than a price based only on a product name.

How is the inspection scope agreed?

Use an item-specific inspection and test plan. For this equipment it should address body and trim identity, lining and seat condition, flange and face-to-face dimensions, specified shell and seat tests, travel direction and actuator function. Identify hold and witness points before production and link the final records to the equipment marks. Where independent inspection is required, agree the inspector and attendance scope before the relevant manufacturing stage.

Can you use the material or standard named in our specification?

Yes, subject to review of the actual item and manufacturing route. Name the standard and edition, material grade, required condition and acceptance criteria in the enquiry. If an alternative is proposed, the difference is stated for agreement before manufacture. Material equivalence, equipment design and manufacturer certification are separate questions and should be resolved separately.

What is the lead time and is the equipment in stock?

Delivery is quoted for the particular order. The schedule depends on drawing approval, material availability, manufacturing, inspection, packing and transport. Give the required site date and identify shutdown constraints so the proposal can separate the production and shipping stages. The examples on this page describe supply capability and past work; they are not an offer of stock or a fixed catalogue lead time.

Can you coordinate packing and shipment to our site?

Yes, with the shipping scope and destination agreed in the order. Confirm package dimensions and weights, lifting arrangements, preservation, unloading access and any assembly needed after delivery. Large equipment may travel in sections or require a special shipping arrangement. Packing dimensions and gross weights are identified separately from the dimensions and net weight of the equipment.

Can I use a past project as the specification for a new order?

Use the reference to identify comparable equipment, then specify the new duty. A recorded quantity, capacity or shipping weight applies to that project and is not a universal operating limit. Where a reference comes from our sister company, the attribution appears beside the case. Send your current operating conditions and interfaces so the new proposal can establish the correct construction and acceptance basis.

08

Discuss your equipment

Send your drawing, operating conditions and required site date. SBCCO-China will review the supply scope, materials, inspection and delivery requirements.