Home/Products/Custom fabrication and build-to-print supply
Custom fabrication and build-to-print supply
SBCCO-China supplies custom steel, cast, forged, FRP and lined components from China against customer drawings and agreed specifications. The work can start with an existing manufacturing drawing, a measured component or an engineering sketch. Scope review, manufacturing route, inspection and shipping requirements are settled before the item is released for production.
01
Supply scope
Build-to-print works best when the purchase order identifies the drawing revision, critical dimensions, material condition and acceptance documents. A sketch can support a preliminary quotation but does not automatically authorize manufacture. For a measured replacement, the review distinguishes surviving dimensions from reconstructed features. The customer or its engineer approves the final manufacturing basis before production.
Heavy platework and structures
Frames, chutes, hoppers, platforms, skids and fabricated assemblies coordinated with the customer’s layout and installation interfaces.
Cast and forged replacement parts
Mill heads, gears, trunnions, pinions and other components, with material route, machining and acceptance established together.
Process and corrosion-resistant fabrication
Tanks, piping, internals and FRP or lined assemblies, with service conditions and design responsibilities defined in the enquiry.
Packing and export preparation
Shipping frames, crates, item marking and packing documents coordinated with the route, lifting points and planned site sequence.
02
Documented specifications and selection basis
These are documented product ranges and project examples. They help define an enquiry; the selected equipment is confirmed against its own duty, drawings and acceptance requirements. A historical shipment is not a statement of a shop’s current maximum capacity.
| Item | Specification and scope |
|---|---|
| Verified mill-cover example | One item at 15,600 kg net, packed at 3.5 × 3.5 × 1.55 m, in SBC’s January 2019 shipment record. |
| Verified trunnion example | One trunnion at 1,650 kg net and 2,000 kg gross, in a 1.2 × 1.2 × 1.5 m package in the same shipment period. |
| Manufacturing basis | Approved drawing revision, material specification, heat treatment or welding requirements and critical interfaces. |
| Supply condition | As cast, rough-machined, finish-machined or fabricated and coated, as defined by the order. |
| Inspection and documentation | Agreed dimensional, material, fabrication and test records linked to identifiable items before packing. |
03
Service conditions and applicable standards
Mark dimensions that control assembly, operation and replacement, not just the overall envelope. State whether threads, bores, gasket faces, gear teeth or weld interfaces need special treatment. For a fabricated assembly, agree shop trial fit and the site-weld split where applicable. Separate the responsibility for engineering design from manufacturing to an approved drawing. Changes in material or geometry should be presented as deviations for agreement rather than absorbed silently into production.
There is no single standard for every custom-fabricated item. The drawing and equipment duty establish the material specification, fabrication rules, welding requirements and acceptance tests. ASME Section VIII applies where a pressure-vessel order requires that code; FRP items may use ASTM D3299, ASTM D4097 or ASME RTP-1 as appropriate. Confirm the applicable standard and edition for each item instead of applying a general certification label to the whole package.
04
Inspection and release documents
The inspection plan turns the purchase specification into manufacturing checkpoints. Before production, identify the drawing revision, material requirements, acceptance limits and required records. Separate mandatory hold points from progress observations so that an inspection visit happens while the work can still be checked. If the order includes a third-party witness, the attendance and release arrangements belong in the schedule.
For this product line, the review focuses on drawing revision control, agreed material records, critical dimensions, weld or heat-treatment requirements, assembly interfaces, coating or lining records and packing identification. The final document list is agreed with the order: material records, dimensional reports, applicable fabrication and test records, release information and packing identification. Changes or deviations are resolved against the approved specification before acceptance, with the responsible engineer involved where required.
05
Project references with measured scope
15,600 kg mill cover shipped to Chile
SBC’s packing list dated 15 January 2019 records one mill cover shipped to Chile through Wiedco. The listed net weight is 15,600 kg, gross weight 17,100 kg and package size 3.5 × 3.5 × 1.55 m. This is an actual shipment reference for a replacement mill component. Package size does not establish the casting’s finished diameter, and the record is not a maximum foundry or machining capacity.
1,580 kg trunnion liner for a Chilean ball mill
The 2025 shipment packing list for the Molino Bola 18A replacement records one trunnion liner, 1,580 kg net, in a 1,700 kg gross package. The shipping package measures 172 × 172 × 155 cm. The reference demonstrates a documented replacement-part shipment; it does not state an operating-life result or confirm interchangeability with a different mill.
06
What to send for a quotation
Send drawing and revision, material and supply condition, quantity, critical dimensions and interfaces, operating duty, applicable standards, inspection points, coating or lining system and packing limits. Include quantities, the required date at site, the destination port or plant and the preferred delivery terms. If you are replacing existing equipment, add photographs showing connections, access and the failure or wear pattern. Mark dimensions that have been measured on site and identify any values still awaiting confirmation.
For a comparable quotation, define the battery limits: equipment, bought-out components, supports, drawings, inspection, packing and transport. Ask for technical exceptions and exclusions alongside the price. This makes it possible to compare proposals on the same scope and prevents an omitted inspection, connection or document from becoming a site problem. A preliminary budget can proceed with stated assumptions; manufacture follows the approved final requirements.
07
Buyer questions
Can you work from a sketch or a worn sample?
Yes, for review and development of a manufacturing proposal. Features that must be inferred are identified, and the drawing and acceptance basis are agreed before manufacture. A sample is especially useful for fit, but it cannot by itself establish the original alloy, heat treatment or design loads.
What information do you need to quote?
Send drawing and revision, material and supply condition, quantity, critical dimensions and interfaces, operating duty, applicable standards, inspection points, coating or lining system and packing limits. Include the required delivery date, destination and inspection requirements. Identify which information is preliminary and which drawing is approved. We can then return a scoped proposal with technical assumptions, exclusions, documentation and the proposed delivery basis, rather than a price based only on a product name.
How is the inspection scope agreed?
Use an item-specific inspection and test plan. For this equipment it should address drawing revision control, agreed material records, critical dimensions, weld or heat-treatment requirements, assembly interfaces, coating or lining records and packing identification. Identify hold and witness points before production and link the final records to the equipment marks. Where independent inspection is required, agree the inspector and attendance scope before the relevant manufacturing stage.
Can you use the material or standard named in our specification?
Yes, subject to review of the actual item and manufacturing route. Name the standard and edition, material grade, required condition and acceptance criteria in the enquiry. If an alternative is proposed, the difference is stated for agreement before manufacture. Material equivalence, equipment design and manufacturer certification are separate questions and should be resolved separately.
What is the lead time and is the equipment in stock?
Delivery is quoted for the particular order. The schedule depends on drawing approval, material availability, manufacturing, inspection, packing and transport. Give the required site date and identify shutdown constraints so the proposal can separate the production and shipping stages. The examples on this page describe supply capability and past work; they are not an offer of stock or a fixed catalogue lead time.
Can you coordinate packing and shipment to our site?
Yes, with the shipping scope and destination agreed in the order. Confirm package dimensions and weights, lifting arrangements, preservation, unloading access and any assembly needed after delivery. Large equipment may travel in sections or require a special shipping arrangement. Packing dimensions and gross weights are identified separately from the dimensions and net weight of the equipment.
Can I use a past project as the specification for a new order?
Use the reference to identify comparable equipment, then specify the new duty. A recorded quantity, capacity or shipping weight applies to that project and is not a universal operating limit. Where a reference comes from our sister company, the attribution appears beside the case. Send your current operating conditions and interfaces so the new proposal can establish the correct construction and acceptance basis.
08
Discuss your equipment
Send your drawing, operating conditions and required site date. SBCCO-China will review the supply scope, materials, inspection and delivery requirements.
Download an enquiry guide
Download directly; no email address is required.