Crushing, milling and wear parts

Home/Products/Crushing, milling and wear parts

Crushing, milling and wear parts

SBCCO-China supplies crushers, mills, conveying equipment and replacement wear parts from China. The scope includes jaw, cone and gyratory crushing, ball and SAG milling, liners, gears, mill heads, trunnions and ceramic or composite wear protection. Selection starts with the feed, duty and interfaces of the machine that the equipment must serve.

01

Supply scope

A complete machine and a replacement liner require different enquiry information. A new crusher needs a feed and product basis, while a replacement part needs reliable geometry, material and installation details. For worn or unsupported machines, measured features must be distinguished from reconstructed geometry. The replacement drawing is agreed before a production pattern or machining route is released.

Complete crushing equipment

Jaw, cone, gyratory, impact and hammer crushers, with screens and feeders coordinated around the feed and required product.

Grinding equipment and heavy spares

Ball and SAG mills, mill heads, shells, trunnions, girth gears, pinions and associated drive components, supplied against project drawings.

Crusher and mill wear parts

Jaw plates, mantles, concaves, blow bars, liners and grinding media, with alloy and heat treatment selected for the impact and abrasion conditions.

Wear protection and conveying

Ceramic-rubber panels, bimetal and overlay plates, conveyor idlers and pulleys. Specify the mounting and material-handling conditions as well as the wear material.

02

Documented specifications and selection basis

These are documented product ranges and project examples. They help define an enquiry; the selected equipment is confirmed against its own duty, drawings and acceptance requirements. A historical shipment is not a statement of a shop’s current maximum capacity.

ItemSpecification and scope
Gyratory crusher selection rangeAbout 1,500–7,500 t/h in the current supply presentation; output is model- and duty-dependent.
Jaw crusher selection rangeAbout 60–1,500 t/h in the supply presentation; feed properties and required product must be checked.
Manganese wear alloysMn13, Mn13Cr2, Mn18, Mn18Cr2 and Mn21Cr2 appear in the wear-parts material range.
White iron and compositesCr20 / Cr25 white iron, martensitic-ceramic and high-chromium-ceramic options are listed; suitability is application-specific.
Replacement geometryDrawing-controlled seats, bores, bolt circles and interfaces; the part number alone is not a fit certificate.

03

Service conditions and applicable standards

Describe feed size, abrasiveness, hardness, moisture, throughput and the required product before comparing crushing options. For liners, include the failure pattern and the current operating practice: breakage, uneven wear and loose seating lead to different investigations. For a gear or trunnion, preserve the original drawing references and identify mating components. A material substitution should be assessed together with heat treatment and acceptance testing, rather than selected from hardness alone.

ASTM A128/A128M covers austenitic manganese steel castings and ASTM A532/A532M covers abrasion-resistant cast irons. They are material specifications, not automatic evidence of machine performance or dimensional interchangeability. The enquiry should name the required grade, heat treatment, mechanical tests and drawing acceptance criteria. Alternative standards or materials are presented for agreement before manufacture.

04

Inspection and release documents

The inspection plan turns the purchase specification into manufacturing checkpoints. Before production, identify the drawing revision, material requirements, acceptance limits and required records. Separate mandatory hold points from progress observations so that an inspection visit happens while the work can still be checked. If the order includes a third-party witness, the attendance and release arrangements belong in the schedule.

For this product line, the review focuses on heat identification, material chemistry, heat-treatment records, hardness at the agreed locations, critical seat and bolt dimensions, and the specified non-destructive examination. The final document list is agreed with the order: material records, dimensional reports, applicable fabrication and test records, release information and packing identification. Changes or deviations are resolved against the approved specification before acceptance, with the responsible engineer involved where required.

05

Project references with measured scope

1,580 kg trunnion liner for a Chilean ball mill

The 2025 shipment packing list for the Molino Bola 18A replacement records one trunnion liner, 1,580 kg net, in a 1,700 kg gross package. The shipping package measures 172 × 172 × 155 cm. The reference demonstrates a documented replacement-part shipment; it does not state an operating-life result or confirm interchangeability with a different mill.

View this project reference

1,893 kg mill girth gear for Chuquicamata

SBC’s packing record for a Marcy mill girth gear identifies the destination as Codelco Chuquicamata through Wiedco. It records one gear at 1,893 kg net and 1,910 kg gross, packed at 2,900 × 1,470 × 700 mm. These are shipment figures. Gear accuracy, tooth geometry, material and heat treatment for any replacement must be established from that replacement’s approved drawings and acceptance requirements.

View this project reference

06

What to send for a quotation

Send machine make and model, part description, drawing revision, dimensions or a sample, required quantity, present material, feed and operating conditions, wear photographs and installation interfaces. Include quantities, the required date at site, the destination port or plant and the preferred delivery terms. If you are replacing existing equipment, add photographs showing connections, access and the failure or wear pattern. Mark dimensions that have been measured on site and identify any values still awaiting confirmation.

For a comparable quotation, define the battery limits: equipment, bought-out components, supports, drawings, inspection, packing and transport. Ask for technical exceptions and exclusions alongside the price. This makes it possible to compare proposals on the same scope and prevents an omitted inspection, connection or document from becoming a site problem. A preliminary budget can proceed with stated assumptions; manufacture follows the approved final requirements.

Send your drawing and service conditions

07

Buyer questions

Can you quote a replacement part without an original manufacturing drawing?

Yes, a sample or a measured worn part can support a proposed reconstruction. Critical interfaces and the assumed unworn profile must be identified and approved. A quotation drawing can support an estimate, but production still requires the agreed manufacturing drawing and acceptance plan.

What information do you need to quote?

Send machine make and model, part description, drawing revision, dimensions or a sample, required quantity, present material, feed and operating conditions, wear photographs and installation interfaces. Include the required delivery date, destination and inspection requirements. Identify which information is preliminary and which drawing is approved. We can then return a scoped proposal with technical assumptions, exclusions, documentation and the proposed delivery basis, rather than a price based only on a product name.

How is the inspection scope agreed?

Use an item-specific inspection and test plan. For this equipment it should address heat identification, material chemistry, heat-treatment records, hardness at the agreed locations, critical seat and bolt dimensions, and the specified non-destructive examination. Identify hold and witness points before production and link the final records to the equipment marks. Where independent inspection is required, agree the inspector and attendance scope before the relevant manufacturing stage.

Can you use the material or standard named in our specification?

Yes, subject to review of the actual item and manufacturing route. Name the standard and edition, material grade, required condition and acceptance criteria in the enquiry. If an alternative is proposed, the difference is stated for agreement before manufacture. Material equivalence, equipment design and manufacturer certification are separate questions and should be resolved separately.

What is the lead time and is the equipment in stock?

Delivery is quoted for the particular order. The schedule depends on drawing approval, material availability, manufacturing, inspection, packing and transport. Give the required site date and identify shutdown constraints so the proposal can separate the production and shipping stages. The examples on this page describe supply capability and past work; they are not an offer of stock or a fixed catalogue lead time.

Can you coordinate packing and shipment to our site?

Yes, with the shipping scope and destination agreed in the order. Confirm package dimensions and weights, lifting arrangements, preservation, unloading access and any assembly needed after delivery. Large equipment may travel in sections or require a special shipping arrangement. Packing dimensions and gross weights are identified separately from the dimensions and net weight of the equipment.

Can I use a past project as the specification for a new order?

Use the reference to identify comparable equipment, then specify the new duty. A recorded quantity, capacity or shipping weight applies to that project and is not a universal operating limit. Where a reference comes from our sister company, the attribution appears beside the case. Send your current operating conditions and interfaces so the new proposal can establish the correct construction and acceptance basis.

08

Discuss your equipment

Send your drawing, operating conditions and required site date. SBCCO-China will review the supply scope, materials, inspection and delivery requirements.

Download an enquiry guide

Download directly; no email address is required.