Equipment for mining and process industries

Home/Industries

Equipment for mining and process industries

Use the industry pages to connect the plant duty with the equipment, materials and inspection needed. The supply scope can cover a replacement item or a coordinated equipment package; process design and installation responsibilities are agreed separately.

01

Industry routes

Mining and mineral processing

Crushing and grinding parts, wear protection, slurry handling and separation equipment.

Smelting and refining

Corrosion-resistant ductwork, acid-service equipment, piping, lined valves and inspected heat-exchanger components.

Solvent extraction and electrowinning

FRP vessels, columns, internals and liquid-handling components selected against the organic and aqueous phases.

Water and wastewater

Clarifier internals, launders, collection systems, piping and retrofit equipment matched to existing basins.

Chemical processing

Steel, FRP and lined equipment selected for the actual chemical, concentration, temperature and vacuum conditions.

Power generation and flue gas

Equipment for gas handling, corrosion control, heat exchange and maintenance packages, with the applicable construction code defined per item.

Cement

Mill and crusher spares, gears, wear components, conveying and fabricated plant equipment.

02

Define the duty before the material

Tell us what the equipment handles, how it operates and what has failed or changed. A shutdown replacement needs verified interfaces and a required site date; a new process duty needs a design basis and clear performance responsibility. The quotation should separate equipment, engineering, inspection, packing and shipment.

03

Match the enquiry to the plant problem

A shutdown replacement

Identify the existing equipment, the worn or failed component, critical interfaces and the date the site needs it. Photographs and a dimensional survey help distinguish a repeat replacement from a redesign. State what site work is included and which parts must fit existing supports or pipework.

A corrosive service

Provide the medium, concentration, temperature range, pressure or vacuum and cleaning conditions together. The resin, polymer lining or metal alloy is selected against the combined duty. A material that worked elsewhere is a useful reference, but does not establish suitability for a different liquor or temperature.

A new equipment package

Set the battery limits before comparing proposals: equipment, design data, purchased components, supports, inspection, packing and shipment. Identify the engineer responsible for process performance and the acceptance test. A fabrication quotation should not silently absorb the responsibilities of the plant designer.

Evidence you can compare

Use the linked project references to compare the actual equipment type, quantity and supply scope. Shipping weights and package dimensions belong to those shipments. Sister-company references are attributed beside the case, so a useful comparison does not change who performed the original supply.

08

Discuss your equipment

Send your drawing, operating conditions and required site date. SBCCO-China will review the supply scope, materials, inspection and delivery requirements.

Download an enquiry guide

Download directly; no email address is required.